Asbestos Removal

Asbestos Floor Tile & Mastic Removal in Pittsburgh, PA

Nine-inch square tiles on a basement or kitchen floor are one of the best-known signs of an older house, and many of them contain asbestos. So does a lot of the black cutback adhesive used to lay them, even under tiles that test negative. The tile itself is fairly stable while it stays whole. The risk comes when it is broken up, sanded, or ground off with the mastic to make way for new flooring. Proper removal keeps the tile intact where possible, keeps it wet, and takes the mastic off with methods that do not turn it into dust.

The Nine-Inch Square

Vinyl-asbestos tile was the cheap, hard-wearing floor of the mid-century house. It went down in kitchens, basements, rec rooms and hallways in huge quantities, usually as nine-inch squares in marbled greys, greens, browns and reds. Twelve-inch tiles from the same decades were often made the same way. In older Pittsburgh-area houses it is common to find two or three layers: original tile, a later tile on top, and sheet vinyl or carpet over the lot. Each layer is a separate material and gets its own sample.

The Glue Underneath

The adhesive is often the bigger issue. Black cutback mastic, the tar-like glue used under a lot of old tile, frequently contained asbestos, and it stays on the slab or subfloor after the tiles come up. It is regularly positive under tiles that test negative. The problem is what happens next: flooring installers grind or sand the slab to get a flat, clean surface, and grinding asbestos mastic is one of the more effective ways to put fibres into the air. That is why the tile and the mastic are tested, and treated, as two separate jobs.

Removal Without Breaking It Up

Floor tile is classed as nonfriable while it is whole, and the method is built around keeping it that way. The room is sealed off, the tile is kept wet, and it is lifted with hand tools so it comes up in whole or large pieces rather than shattered. The mastic is then softened with a remover made for the purpose and scraped up wet, never ground. What is left is a clean slab or subfloor that the next trade can prepare without disturbing anything, and a clearance check before the containment comes down.

Covering It Instead

Tile that is firmly stuck, intact and flat can often stay and be covered with new flooring laid over it. It is a legitimate option and it is cheaper. The catch is that the floor still contains asbestos, so it must not be sanded, and anyone who later takes the floor up has to know it is there. If you are going down to the slab anyway, as part of a basement finish or a larger renovation, removal is usually the better order. A sample of each layer settles which route makes sense.

How long does it take? A basement or kitchen floor is usually one to two days, depending on how well the tile lets go and how much mastic is underneath.

Asbestos questions we get most

Can I just put new flooring over the old tile?
Often, yes. Covering intact tile with new flooring is a recognised way to leave it in place. What you should not do is sand, grind or shot-blast it. If the old tile is loose or you need the floor down to the slab, removal is the better route.
Is the black glue under the tile asbestos too?
It can be. Black cutback mastic often contained asbestos, and it is tested separately from the tile because the two were different products. A negative tile can sit on a positive adhesive.
Does 12-inch tile contain asbestos?
Some does. Nine-inch tiles are the classic warning sign, but 12-inch tiles from the same decades were also made with asbestos. Size is a hint, not a test.
How do you get the mastic off without grinding?
With wet methods and chemical removers designed for it, which soften the adhesive so it can be scraped up rather than abraded into dust.

Related Services

These usually come up in the same conversation:

Free · No obligation

Request an inspection

Tell us what you've found and where. We'll call back to set up testing.

  • Free estimates once the material is identified
  • Scope and price approved by you before work starts
  • Clearance air test before containment comes down
  • We will tell you if the lab says it is not asbestos

Call Now · (412) 725-2202